
GRIP Engineers successfully supplied and commissioned a 1.75 Ton Capacity Rope Winding System with a rope winding capacity of 300 meters for M/s. Taikisha Engineering India Ltd.
The system was developed for railway coach pulling applications, ensuring reliable and controlled movement of coaches during operations. With a robust design and precision engineering, the equipment enhances efficiency and safety in handling railway rolling stock.