60 Ton Capacity DG Erection Gantry Crane – Sone River Bridge Project

Design and execution of a 60 Ton DG Erection Gantry Crane for Nagarjuna Construction Co. Ltd., used in the Sone River Bridge Project, Bihar (2002) for heavy bridge erection works.

Description

GRIP Engineers successfully executed the design and supply of a 60 Ton Capacity DG Erection Gantry Crane for M/s. Nagarjuna Construction Co. Ltd. The crane was deployed at the Sone River Bridge Project in Bihar for heavy erection works in bridge building. With a 5.4m span and 7m lift, the system was engineered for precision, reliability, and durability, ensuring smooth handling of critical construction activities.

Specifications

  • Capacity: 60 Ton
  • Span: 5.4 mtr.
  • Lift: 7 mtr.
  • Application: Bridge Building
  • Year of Execution: 2002

Client Name

M/s. Nagarjuna Construction Co. Ltd.

Location

Bihar (Project Site), Hyderabad (Client Office)